01

Main hall construction

02

Acoustic reflector panels lowered to the align with the bottom of the gantries

03

Acoustic reflector panels lowered to the align with the bottom of the gantries

04

Upper facade installation complete

05

Upper facade installation complete

06

Installation of the extruded aluminum fluted panels

07

Main hall with three utility trusses lowered

08

Installation of the extruded aluminum fluted panels

09

Installation of the extruded aluminum fluted panels

10

East entry glass installation

11

East entry glass installation

12

Rehearsal studio with seating bleacher deployed

13

Main hall construction

14

Main hall construction

15

Main hall construction

16

Gridiron level

17

Installation of acoustic reflector panel motors 

18

Gridiron level

19

The Lindemann Performing Arts Center donor signage

20

First row of acoustic reflector panels (ARPs) installed

21

Drawbridges being installed in main hall

22

Installation of first panel of exterior glazing

23

Installation of first panel of exterior glazing

Performance mock-up of a main hall drawbridge

Main hall east gantry movement test

Main hall gantry movement test

First movement test of a main hall gantry

28

Roof steel completed

29

Aluminum extrusions in production

30

Topping off ceremony

31

Belt trusses completed

32

Core and gantry steel completed

33

View looking down into Main Hall

34

Core and gantry steel completed

35

East core steel erected

36

North gantry steel erected

37

Above grade steel construction begins

38

Rehearsal room lids in place

39

Below grade cores completed

40

Acoustic reflective panel mock-up

41

Acoustic reflector panel mock-up

42

IGUS chain mock-up

43

Facade visual mock-up

44

Facade visual mock-up

45

Excavation complete

46

Aluminum extrusion mock-up

Image Credit: 3: Nick Dentamaro; 1, 4, 5, 6, 7, 10, 11, 12: Odeh Engineers, Inc; 2: Roschmann