Main hall construction
Acoustic reflector panels lowered to the align with the bottom of the gantries
Acoustic reflector panels lowered to the align with the bottom of the gantries
Upper facade installation complete
Upper facade installation complete
Installation of the extruded aluminum fluted panels
Main hall with three utility trusses lowered
Installation of the extruded aluminum fluted panels
Installation of the extruded aluminum fluted panels
East entry glass installation
East entry glass installation
Rehearsal studio with seating bleacher deployed
Main hall construction
Main hall construction
Main hall construction
Gridiron level
Installation of acoustic reflector panel motors
Gridiron level
The Lindemann Performing Arts Center donor signage
First row of acoustic reflector panels (ARPs) installed
Drawbridges being installed in main hall
Installation of first panel of exterior glazing
Installation of first panel of exterior glazing
Performance mock-up of a main hall drawbridge
Main hall east gantry movement test
Main hall gantry movement test
First movement test of a main hall gantry
Roof steel completed
Aluminum extrusions in production
Topping off ceremony
Belt trusses completed
Core and gantry steel completed
View looking down into Main Hall
Core and gantry steel completed
East core steel erected
North gantry steel erected
Above grade steel construction begins
Rehearsal room lids in place
Below grade cores completed
Acoustic reflective panel mock-up
Acoustic reflector panel mock-up
IGUS chain mock-up
Facade visual mock-up
Facade visual mock-up
Excavation complete
Aluminum extrusion mock-up